Current Projects

  1.  Library/Studio
    1. Rescue existing hardwood floors - DONE
    2. Build Hidden Space/Art Storage - Match existing builtin shelf as secret door covering nook for unhung art - DONE
    3. Replace Outlets for with grounded 3 prong plugs - DONE
    4. Repair/Paint Walls and Ceiling - DONE
    5. Build Benchtop/Built In Unit - Book Shelves/Kitty Station - IN PROGRESS
    6. Rescue Floor Trim - IN PROGRESS
    7. Paint Door - TO DO
  2. 2013 Cleveland Motorwerks Cafe Racer
    1. Wire for Battery Tender - DONE
    2. Wire for USB Power at Handlebar - DONE
    3. Mount Phone Mount - DONE
    4. Fiberglass Wrap Exhaust - DONE
    5. Silicone Spray Exhaust Wrap - DONE
    6. Obtain Personalized Plates (PACK3T) - DONE
    7. Mount Registration/Insurance tube on License Plate - DONE
    8. Troubleshoot Left Blinker Issue - Flashers were on - DONE
    9. Repair Lefthand Controls (should be replaced/remounted) - DONE
    10. Obtain GPS Speed-o-meter and Housing - TO DO
    11. Wire and Mount Speed-o-meter and Housing - TO DO
    12. Safety Inspection (Due by end of 5/18) - TO DO
  3. 1968 Checy C10
    1. Battery
      1. New Battery - DONE
      2. Wire Battery Cut Off Switch - DONE
      3. Install New Positive Battery Lead - DONE
      4. Remove Chassis Mounted Positive Junction Terminal - DONE
      5. Mount Battery Cut Off Switch - TO DO
      6. Replace Chassis Mounted Positive Junction Terminal - TO DO
      7. Replace Negative Battery Lead - TO DO
      8. Replace Battery Tray - TO DO
    2. Radiator/Heating
      1. Install/Mount Radiator Overflow Bucket - TO DO
      2. Replace Radiator Hoses - TO DO
      3. Replace Heater Core and Heater Core Radiator Hoses - TO DO
      4. Replace Heater Channels - TO DO
      5. Replace Heater Controls - TO DO
    3. Wiper System
      1. Replace Wiper Motor - TO DO
      2. Replace Wash Pump - TO DO
      3. Replace Wiper/Wash Switch - TO DO
      4. Replace Wash Nozzles - TO DO
      5. Mount Wash Jar/Lid/Filter - TO DO
      6. Install Wash Tubing - TO DO
    4. Lighting
      1. Replace Headlights with LED Headlights - TO DO
      2. Replace Tailights with LED Taillights - TO DO
      3. Replace Backup Lights with LED Backup Lights - TO DO
      4. Locate Front Turn Indicator LEDs - TO DO
      5. Replace Front Turn Indicator with LEDs - TO DO
      6. Install Interior Dome Light - TO DO
      7. Replace Interior Dome Light with LED Bulb - TO DO
      8. Mount and Wire Plate Light - TO DO
    5. General Electrical
      1. Remove all unused Fuses and Wiring - TO DO
      2. Replace Ground Straps - TO DO
      3. Obtain Wiring Harness - TO DO
    6. General Mechanical
      1. Replace Air Cleaner - DONE
      2. Check Brakes - TO DO
      3. Repair/Replace Emergency Brake - TO DO
      4. Check Tires/Wheels - TO DO
      5. Check Transmission (Exact Year/Model) - TO DO
      6. Check Clutch - TO DO
      7. Check Engine Health (Exact Year/Model) - TO DO
      8. Check Suspension - TO DO
      9. Replace Shocks - TO DO
      10. Replace Door, Glovebox and Ignition Locks - TO DO
    7. General Body/Chassis
      1. Evaluate Chassis - TO DO
      2. Patch Drivers Side Door - TO DO
      3. Replace Drivers Side Rocker Panel - TO DO
      4. Patch Passengers Side Door - TO DO
      5. Replace Passengers Side Rocker Panel - TO DO
      6. Obtain Bedliner - TO DO
      7. Re”paint” Exterior (sand/fill/prime) - TO DO
    8. Interior
      1. Repair Interior Body - TO DO
      2. Prep for Interior Body Paint (sand/file/prime) - TO DO
      3. Paint Interior Body - TO DO
      4. Remove Reupholster and Install Bench Seat - TO DO
      5. Install 3 Pt Seat Belts - TO DO
      6. Reupholster and Install Dash Pad - TO DO
      7. Replace Radio - TO DO
      8. Install Speakers - TO DO
      9. Replace Glovebox Interior - TO DO
      10. Replace Instrument Cluster - TO DO
  4. Office/Electronics Workshop
    1. Obtain Soundproof Door - DONE
    2. Remove Ceiling - DONE
    3. Frame Studio Walls - TO DO
    4. Install Door - TO DO
    5. Wire New Circuits - TO DO
    6. Wire Ethernet - TO DO
    7. Wire Video - TO DO
    8. Install Sound Insultation - TO DO
    9. Install Lights - TO DO
    10. Install Outlets - TO DO
    11. Install Patch Panels - TO DO
    12. Install Gun Safe - TO DO
    13. Drywall Ceiling - TO DO
    14. Drywall Walls - TO DO
    15. Complete Built-Ins - TO DO
    16. Carpet Floor - TO DO
    17. Build Electronics Bench - TO DO
    18. Build Couch/Bed - TO DO
    19. Build Desk/Entertainment Center - TO DO
  5. Shop
    1. Collecting Tools and Moving Stuff Around Alot - IN PROGRESS
  6. Shed/Metal Shop
    1. Design - TO DO
  7. Fence
    1. Design Gate - TO DO
    2. Design Retaining Wall and Wide Gate - TO DO
    3. Remove Existing Chain Link Gates - TO DO
    4. Repair/Replace Chain Link Fence - TO DO
    5. Cut Border Beds - TO DO
    6. Install Flashing around Fence - TO DO
    7. Mulch Beds - TO DO
    8. Build Walking Gate - TO DO
    9. Build Retaining Wall - TO DO
    10. Build Wide Gate - TO DO